Aerial Photography of Project Site Site After with Planting and Stablization Complete Site After with Planting and Stablization Complete Site After with Planting and Stablization Complete
Aerial Photography of Project Site
|
The Shoreline Restoration
Project was done as a demonstration site to show the
alternatives to rock only shoreline protection. This
project will restore a native shoreline improving aesthetics
and aquatic and wildlife habitat.
Major project activities included:
- Bio Log installed at the shoreline to break up wave
action
- Native aquatic plant plugs were planted into the bio
log for long term shoreline protection
- Native wet meadow and upland plants and plugs with
mulch were planted in the transitional area between the
shoreline and top of the bank.
Project funding: Total project cost was $1,368.00
- Landowner ($342.00 - 25%)
- Scott WMO ($1,026 - 75%)
|
|
|
|
|
|